Ridgecrest Camps

Spring Time and Paint

April 16th, 2010

It’s finally Springtime here at Crestridge, all the flowers are blooming, the sky is especially blue, and the only thing missing is all of your smiling faces!  Our construction crews are finishing up the little details to the cabins which included the painting of the outside walls.  Everything looks so fresh and it sure is getting us pumped up about spending the summer with all of you, so get here already!  Here are some pictures of Crestridge in the Springtime, enjoy!

Chickasaw 8 and 9 with their new paint job. Chippewa 1's new door! Empty Playground

Cherokee Hill with new paint! Spring Flowers

Less than 60 days until the first set of campers come for Summer 2010!  We are so excited, are you getting ready?  Post a comment and share with others how you survive without camp as the summer continues to get closer!

Construction Update

March 16th, 2010

The sun is shining and camp is finally free of the snow!  Don’t get us wrong the winter is a great part of our year, but spring will be arriving soon, and that means summer time is right around the corner.  The construction crews are getting busy trying install the rest of the showers and toilets, and things are coming along quickly.  All Chippewa cabins have their sinks, showers, and toilets installed, the majority of the Chickasaw cabins do as well.  Here’s a couple of shots of these brand new editions:

Sunshine Trail Chippewa 2

Chippewa 2 Close-Up Chippewa 3 sinks New Shower

Be looking for your Crestridge Bear Tracks newsletter, coming in the mail next week.  And be sure to comment and enjoy the spring weather!

Construction Keeps Moving Forward

February 22nd, 2010

Our construction crews are steadily moving forward and making some major progress on the cabin renovations.  The Cherokee cabins all have new walls and ceilings that look absolutely amazing.  Having two toilets and two showers in every cabin sure will make things easier then back in the days when the whole Choctaw Village had to share one Bath House.  The crews have also started to install the showers into the Chippewa and Chickasaw cabins; changes are happening so quickly!  Check out some of the shots of the improvements as well as the saved names section in Cherokee 4.

 Cherokee 1 wall Cherokee 1 Back Wall Cherokee 4 Front Wall

Cherokee 4 Signatures Chippewa 1 Showers

Hope you’re getting as excited about camp as we are, and remember to comment and let us know what you think!

Another Snowy Day in Ridgecrest

February 1st, 2010

Once again Jack Frost himself has covered our lovely camp with white snow.  This time we received about 6 inches of the white fluffy stuff and are truly enjoying it to the fullest.  Here are some pictures of your home away from home covered in snow:

 Chapel Creek Cheyenne/Choctaw Steps

 Campfire Area Chip/Chick Playground

Also, even through the cold winter days our construction crews are moving along with enthusiasm.  All of the Cheyenne and Choctaw cabins have their siding up, and the Cherokee cabins are getting their new inside walls.  Cherokee 25 seems like a completely new building with a higher ceiling and open floor plans- these changes are so exciting!  Here are a few pictures to show the updated construction with more to come soon.

Cheyenne 11 Looking down Choctaw Hill Cheyenne 12

New walls in Cherokee 25 Back wall of Cherokee 25

Check in soon for more updates and remember to comment for your chance of winning a Free Store!

Construction and Ice

January 7th, 2010

Within the past few weeks, the construction crews have finished putting the new metal roofs on all the cabins and are now putting the siding on.  They have finished the Chippewa and Chickasaw cabins and are now working on Cherokee Hill.  They will eventually paint the cabins the same color as the new cabins added last year.  Most the electrical and plumbing has been completed.  They have slowed down a little because of the cold weather and all the snow.  But they are still moving forward!

Chickasaw 9 Cherokee 25

We’ve decided to keep a section open in each cabin so you can see old signatures from the past.  Here’s what it will look like.

Chickasaw 9 Signatures

I know all you Floridians have been experiencing some cold weather recently.  We are excited about next week because the weather channel is saying the temperature may actually reach 40 degrees!  There is still quite a bit of snow left from the storm 3 weeks ago and the lakes are freezing over.  It is unusual to see the Crestridge lake frozen because there usually isn’t any water in there.  So savor these next few pictures!

Crestridge Chapel in the snow Frozen Crestridge Lake-1 Frozen Crestridge Lake-2

Check back soon for more updates!  Hope you all had a wonderful Christmas and a Happy New Year!

4 Villages Down, 1 to Go

November 23rd, 2009

As of 3PM today (Nov. 23), there are only 3 cabins that need a new roof along with the cabin extension.  Those construction workers are just going so fast!  There has been a lot of progress since the last Construction Blog.  They have finished adding the roofs and extensions on all Cheyenne cabins and Choctaw 14.  They are almost finished with the electrical work on Cherokee Hill.  And they are finishing putting up the T1-11 in Chippewa 1 and putting the finishing touches on it.  T1-11 is the wood that is going on the inside walls of the cabins.  I know I keep saying this, but the cabins look so good!

Cheyenne 13 Cheyenne Bathrooms with Extension Choctaw 14

Chippewa 1 Bathroom Chippewa 1 Vanity

They haven’t actually finished a cabin yet, but they are getting the major stuff done first before it gets too cold.  Don’t forget, if you comment on any of our blogs, your name will be entered into our monthly drawing for a free store!

Chips/Chicks…Check, Cherokees…Check

November 5th, 2009

I’ll tell you what, those construction workers are fast!  They have now finished the first phase on Cherokee Hill and started with the Choctaw Hill.  It was quite a sight to see all four cabins with no roofs and no bathrooms.  Again, it was confirmation that they really needed some work done!

No roofs Inside Cherokee 25Inside Cherokee 25-Back

Cherokee 24 Cherokee 25 Cherokee 25-New Roof

Cherokee 24 Cherokee 23 Cherokee 24

They are now on Choctaw Hill removing the old roofs, the back walls, and the bathrooms.  I’ll post pictures soon.  I hope you all are enjoying the fall season.  Can’t believe it’s already November, but we are looking forward to the holidays!

Fully Covered Decks

October 22nd, 2009

It seems that soon after we give an update, a lot more gets finished the next day.  As of now, all the Chippewa and Chickasaw cabins have new roofs, new decks, and the new bathrooms framed.  They are looking great!  The decks are fully covered which makes them look even bigger.  They have put the new showers in the cabins and also started on the plumbing in Chippewa 1.  Check out the new pictures:

Chippewa 1 Chippewa 2 Chippewa 3

Chickasaw 4 Chickasaw 5 Chickasaw 7

Chickasaw 8 Chickasaw 9 Chippewa 1 Bathrooms

I’m not sure if you can notice any of the leaves in the background, but they sure are beautiful.  I think the color is almost at it’s peak.  It’s a great time to be in the mountains!

Moving Right along

October 14th, 2009

Almost two weeks ago, I informed you of the cabin renovations that had just started.  Well today, they are working on their 6th possibly 7th cabin (Chip 1, 2, 3, Chick 4, 8, and 9).  The construction crew has not completely finished one cabin, but they have started putting the new roof on and framed the new bathrooms.  Take a look at the progress so far:

Chippewa 2 Chippewa 1 Roof Chippewa 1 New Bathrooms

Chippewa 1 Old Bathrooms Chippewa 3 and Chickasaw 4 Chickasaw 8

With taking out the roofs and bathrooms, there is a lot of trash.  It’s pretty funny to see all the toilets, showers and sinks all piled up around the Dining Hall.

When the crew gets to the Cheyenne and Choctaw cabins, they will extend the cabins.  They’ve already cleared a few trees and poured the footers for the extensions.

Choctaw 20 Choctaw 20 Footer

If you are interested in seeing more pictures, we have a Facebook Fan page that has an album designated for Cabin Renovation pictures.  Keep checking weekly for more updates on construction and other things going on at camp!

Off Season=Construction

September 22nd, 2009

New CabinThis is our second year to do major construction at Crestridge.  During the off season, our goal is to renovate the existing cabins.  What a huge and exciting project!  Starting within the next couple weeks, there will be a construction crew coming in to clear some land behind the Cheyenne and Choctaw cabins so they can extend the cabins.  Then for every cabin they will replace all the floors, then the roofs, then onto moving the bathrooms, then building new decks and more.  Eventually, all the existing cabins will look like the new ones we had this past summer.  The cool thing is that we are not tearing the walls down but building around them.  Unfortunately you will not be able to sign on the new walls, but the heart of the cabin will remain. We will be sure to post videos and pictures of the construction to show you the progress.

Recent

Categories

Archives

RSS Feed

Camp Crestridge for Girls | 828.669.2613 | 800.968.1630 | PO Box 279, Ridgecrest, NC 28770